Burnaby, British Columbia
🧱

Tiling Cost in Burnaby 2026

Tiling costs in Burnaby depend on tile type, area, and surface prep. Shower waterproofing and heated floors are common additions in Canadian bathrooms.

C$8 – C$20per sq ft in Burnaby
4.8★ rated contractors
Licensed professionals
2026 updated rates
Free to post job

Tiling Cost Breakdown in Burnaby 2026

Indicative rates based on recent quotes from contractors in Burnaby, British Columbia. Actual costs may vary based on site conditions and scope of work.

Work TypeMin RateMax RateUnit
Floor Tiling (labour)C$8C$16per sq ft
Wall TilingC$10C$20per sq ft
BacksplashC$12C$30per sq ft
Natural Stone TilingC$15C$30per sq ft
Shower WaterproofingC$600C$1,500per shower
Heated Floor SystemC$12C$25per sq ft
Tile RemovalC$2C$5per sq ft
Levelling / UnderlaymentC$2C$6per sq ft
Rates are indicative averages for Burnaby in 2026 (CAD). Post a job on Biddaro to get competitive quotes from verified local contractors.

Factors Affecting Tiling Cost in Burnaby

Tile type, size, and finish
Area and surface condition
Waterproofing and heated-floor options
Pattern complexity
Removal of existing tile
Local installer rates in Burnaby

How to Save Money on Tiling in Burnaby

1.

Add an electric heated floor in bathrooms for comfort in cold Burnaby winters.

2.

Budget for proper shower waterproofing — it prevents costly damage.

3.

Large-format tiles need a level substrate; factor in underlayment.

4.

Buy 10% extra tile for cuts and future repairs.

Ready to hire a Tiling contractor in Burnaby?

Post your job free on Biddaro. Get competing bids from Burnaby's top licensed contractors within 4 hours.

Find Tiling Contractors in Burnaby

Tiling Cost FAQs – Burnaby, British Columbia

How much does tiling cost in Burnaby?

Tiling labour in Burnaby costs C$8–20/sq ft plus tile. Shower waterproofing adds C$600–1,500 and heated floors more.

Should I add a heated floor in Burnaby?

Heated floors are popular in Burnaby bathrooms for winter comfort, adding roughly C$12–25/sq ft to the tile job.

How long does it take to tile a bathroom?

Tiling a standard bathroom in Burnaby takes 3–5 days including waterproofing and cure time.

How do I find a tile installer in Burnaby?

Compare verified tile installers on Biddaro in Burnaby. Review work, check references, and get quotes.

Tiling Cost in Other Cities in British Columbia

Compare rates across major cities in British Columbia.

Want a complete picture of all construction costs in Burnaby?

Get Accurate Tiling Quotes in Burnaby

Post your job free on Biddaro. Verified Burnaby contractors bid competitively — you save 15–30% on average.

Post Your Job Free